4

Uploading PIR through CSV file in Maintain PIR app

 1 year ago
source link: https://blogs.sap.com/2022/12/29/uploading-pir-through-csv-file-in-maintain-pir-app/
Go to the source link to view the article. You can view the picture content, updated content and better typesetting reading experience. If the link is broken, please click the button below to view the snapshot at that time.
neoserver,ios ssh client
December 29, 2022 2 minute read

Uploading PIR through CSV file in Maintain PIR app

10 10 62

The purpose of this blog post is to explain how to upload PIR in Maintain PIR Fiori app using the upload through Excel/CSV feature.

Step 1- Access the Fiori app- Maintain PIR.

28_01_01.jpg

Step 2- Assign yourself with an area of responsibility (AOR). The AOR is a combination of plant and MRP controllers. You can maintain this through app settings of Maintain PIR or My area of responsibility -Fiori app.

28_01_02.jpg

28_01_03.jpg

Step 3 – Access maintain PIR Fiori app and filter your materials as per various selection criteria .

28_01.jpg

You have the option to filter by Materials/Active version/Last modified date etc. Compare it with MD63 if you plan to change PIR for a material. Observe “Reach” is based on the number of periods for which data exists. If no data is maintained, the reach attribute will show zero.

Step 4 – Click Edit(1) button. The (X) depends on how many materials you want to edit/create PIRs. In the above example, I have chosen 1 material; hence it is showing Edit(1)

Step 5– Click the Excel download button, as highlighted below.

28_02.jpg

You can see that , CSV file with name Material_Details gets downloaded. This is is your input format. Even though you have downloaded just for a material, you can add more materials in the input file.

Step 6– Data before load in Fiori

28_04.jpg

Step 7 – Click upload and edit button to upload edited CSV file

28_05.jpg

Step 8–   After CSV file is uploaded, you will see CSV data (editable) in Fiori app. You can change and save

28_06.jpg

Step 9: You will get a success message if the data uploaded has no errors.

Step 10: Few important things to troubleshoot

1- If data is numeric , convert it to text in CSV.

2- Ensure to map MRP controller in your settings and material master is having MRP controllers for which you have AOR mapped.

Do give feedback if you faced any issues in CSV upload.


About Joyk


Aggregate valuable and interesting links.
Joyk means Joy of geeK