Refurbishment_subcontracting issues during GR
source link: https://answers.sap.com/questions/13755364/refurbishment-subcontracting-issues-during-gr.html
Go to the source link to view the article. You can view the picture content, updated content and better typesetting reading experience. If the link is broken, please click the button below to view the snapshot at that time.
I have three valuation types for a material for plant ABCD and storage location 0001
New, refurbished and faulty
All 3 have the same valuation class
New 300 USD
Refurbished 200 USD
Faulty 100 USD
I created a refurbishment order for subcontracting in transaction IW81
From plant ABCD storage location 0001 valuation faulty
To plant ABCD storage location 0001 valuation refurbished
I click control key PM02 click the checkbox subcontracting and enter other details, material I select rework
From the PR that gets generated automatically I go to tcode ADSUBCON then create PO via PR
For the PO in material data component tab valuation is faulty while in delivery tab the valuation is refurbished.I created a PO for quantity 1.
I then do the post goods issue in the ADSUBCON transaction for valuation type A and movement type 541. In MMBE I could see the stock transfer to vendor us 1.
Now while I do the GR in the ADSUBCON transaction, I could see two materials one for refurbished movement type 101 and other for faulty movement type 543. I Click on Item ok for both the items and post. Two material documents are posted. But when I check in MMBE no stock can be seen for refurbished or faulty valuation type.
What mistake am I doing?
Do the valuation types need to have different valuation class or maintained in different storage locations for the same plant.
Before doing post goods issue I don't click on the delivery for PO as that button is disabled.
Recommend
About Joyk
Aggregate valuable and interesting links.
Joyk means Joy of geeK