Overview JIRA

What is a Board ?

A board displays issues from one or more projects, giving you a flexible way of viewing, managing, and reporting on work in progress. There are two types of boards in Jira Software:

  • Scrum board: For teams that plan their work in sprints. Includes a backlog.
  • Kanban board: For teams that focus on managing and constraining their work-in-progress. Includes the option of a Kanban backlog.

What is a Epic ?

An epic captures a large body of work. It is essentially a large user story that can be broken down into a number of smaller stories. It may take several sprints to complete an epic.

What is a Sprint ?

A sprint — also known as an iteration — is a short (ideally two to four week) period in which the development team implements and delivers a discrete product increment, e.g. a working milestone version.

Introduction to JIRA & Agile Project Management

Introduction to JIRA & Agile Project Management

Install JIRA

Downlaod JIRA

Install JIRA on Windows 7

D:\Program Files\Atlassian\JIRA\bin> dir \software
20.01.2018  15:16       350.857.328  atlassian-jira-software-7.7.0-x64.exe

As Administrator run: atlassian-jira-software-7.7.0-x64.exe
Select: 
  Advanced Mode for installation 
  Ports 9080 9005     [ change Ports if needed ]
  Start as a service  [ Start JIRA as a service ]
Login: 
  Email: 	   [email protected]
  Benutzer:  Helmut.Hutzler
  Password:  .....it
Config: 
  Running the Setup Wizard 

Reference JIRA Installation

Run JIRA on our local System JIRA

  • Note the Link below: http://localhost:9080/secure/Dashboard.jspa works ONLY on my local System !
  • Run JIRA Dashbaord

Working with JIRA

Create a Board using multiple Projects

Create an Agile Board from Existing Projects

Image jira_img1.jpg NOT Found

Add multiple projects to the Board

Image jira_img2.jpg NOT Found

Add a new Project to an existing Board

Boards -> View All Boards -> Configure -> Edit Filter Query -> Press Left Menu Button -> Add/Delete Projects

Image jira_img3.jpg NOT Found

Reconfigure JIRA by running Setup Wizard again

Stop JIRA 
D:\Program Files\Atlassian\JIRA\bin> stop-jira.bat

Delete dbconfig.xml 
D:\Program Files\Atlassian\Application Data\JIRA> del dbconfig.xml

Delete Database Files 
D:\Program Files\Atlassian\Application Data\JIRA\database> dir
21.01.2018  10:16         2.838.528 h2db.mv.db
21.01.2018  09:18            16.208 h2db.trace.db
               2 Datei(en),      2.854.736 Bytes
               2 Verzeichnis(se), 82.347.048.960 Bytes frei

D:\Program Files\Atlassian\Application Data\JIRA\database> del *.db
Möchten Sie "D:\Program Files\Atlassian\Application Data\JIRA\database\*" löschen (J/N)? j

Open JIRA Baseurl to restart the configuration process: http://localhost:9080/

Reference


About Joyk


Aggregate valuable and interesting links.
Joyk means Joy of geeK